Fan & Motor Installation
High-efficiency fan installation, alignment, and balancing for even airflow and minimum electrical draw.

INSTALLED RIGHT. RUNNING ON SCHEDULE.
KilnTech installs new and replacement kiln systems for sawmills across the Southeast — fans, controls, heating, plenum, walk doors, and commissioning, all by one accountable team.
Most kiln performance problems aren't kiln problems — they're installation problems. Misaligned fans, leaky shells, undersized power feeds, miscalibrated sensors, and rushed startups quietly cost mills tens of thousands of dollars per year in lost throughput and fuel.
We install kilns the way we build them: methodically, with field crews who understand lumber drying. The result is a kiln that hits its design throughput from day one and holds it over decades of production.
Mechanical, electrical, controls, and commissioning under one roof.
High-efficiency fan installation, alignment, and balancing for even airflow and minimum electrical draw.
Steam coils, direct-fired burners, hot water loops, or natural gas — installed and integrated with site utilities.
PLC installation, moisture probe placement, RTDs, EMC sensors, and remote monitoring tie-in.
Insulated walk doors, central plenum, and baffle installation built and sealed for high-humidity, high-temperature service.
Track work, kiln cars, vents, dampers, and structural attachments aligned to spec and inspected before commissioning.
Full commissioning cycle, drying schedule load-in, and operator training before turnover.
Engineering depth, field discipline, and lumber-first thinking.
We install KilnTech kilns and integrate with any major manufacturer's equipment.
In-house field crews — not subcontracted labor — for predictable quality and schedule.
Every kiln runs a documented startup cycle and is verified against design before sign-off.
Your team is trained on the controls, schedules, and routine maintenance during turnover.
The crew that installed the kiln is the crew that supports it for life.
We work around your production schedule and hit shutdown windows on time.
Related Solutions
Explore Central Plenum Kiln, Continuous Dual Path Kiln, Turn Key Dry Kilns, Retrofits & Upgrades, Controls & Automation, Parts & Service, and Sawmill Construction.
Yes. KilnTech installs and integrates kiln systems from most OEMs, including iDry, Nyle, USNR, SII, American Wood Dryers, Wellons, and Irvington-Moore.
Mechanical and electrical installation of fans, motors, heating coils, plenums, baffles, walk doors, vents, controls, and commissioning the kiln to your production schedule.
Most installations take 2–8 weeks of field time depending on kiln size, energy source, and the condition of the existing building and infrastructure.
Yes. We integrate kiln controls, calibrate sensors, write or load drying schedules, and run a full commissioning cycle before turnover.
Talk To KilnTech
Talk to KilnTech about kiln system installation, replacement, or commissioning for your sawmill.